A heuristic algorithm for assembly line balancing with stochastic sequence-dependent setup times

  • May 1, 2017
  • Zeynel Abidin Cil +4 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Having analyzed studies on the assembly line balancing problem considering setup times, a few papers are observed. However, researches show that setup time plays an important role in total production time. Besides, in these studies, the setup times are assumed to be deterministic. Considering setup times to be deterministic decreases proximity of problem to real life application. Because the operation and setup times may vary in real applications due to human factors, machine breakdowns, lack of equipment and environmental factors. Therefore, in this study, assembly line balancing problem is investigated considering the sequence-dependent stochastic setup times. A heuristic approach based on COMSOAL is presented for the problem and it is seen that algorithm is effective for the problem.

Similar Papers
  • Research Article
  • Citations1

Effect of Setup Times and Workload Trigger Levels on Order Review and Release Policies Performance in a Stochastic Dynamic Job Shop with Sequence-Dependent Setup Time — A Simulation Approach

  • Jul 21, 2023
  • Journal of Advanced Manufacturing Systems
  • Sushma Rani +2
  • Research Article
  • Citations72

Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times

  • Aug 29, 2018
  • Applied Mathematical Modelling
  • Mukund Nilakantan Janardhanan +4
  • PDF
  • Research Article
  • Citations9

Improved firefly algorithm with courtship learning for unrelated parallel machine scheduling problem with sequence-dependent setup times

  • Mar 12, 2022
  • Journal of Cloud Computing
  • Xingwang Huang +5
  • Conference Article
  • Citations1

Scheduling policies in multi-product manufacturing systems with sequence-dependent setup times

  • Dec 01, 2011
  • Wei Feng +2
  • Research Article
  • Citations5

Single-Machine Order Acceptance and Scheduling Problem Considering Setup Time and Release Date Relations

  • Jul 16, 2020
  • Arabian Journal for Science and Engineering
  • Papatya S Bıçakcı +2
  • Book Chapter

Dynamic Facility Location Problem with Stochastic Setup Times

  • Jan 01, 2019
  • Maria Do Céu Marques +1
  • Book Chapter
  • Citations3

Scheduling Operations and SMED: Complementary Ways to Improve Productivity

  • Jan 01, 2019
  • Fernando Charrua-Santos +4
  • Research Article
  • Citations51

Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration

  • Dec 23, 2009
  • Journal of Scheduling
  • Geraldo R Mateus +3
  • Research Article
  • Citations7

Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times

  • Oct 11, 2007
  • Decision Making in Manufacturing and Services
  • Ali Allahverdi
  • Research Article
  • Citations1352

A survey of scheduling problems with setup times or costs

  • Jun 01, 2008
  • European Journal of Operational Research
  • Ali Allahverdi +3
  • Conference Article
  • Citations17

Modeling&Solving Flexible Job Shop Problem With Sequence Dependent Setup Times

  • Oct 01, 2006
  • N Imanipour
  • Research Article
  • Citations110

Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns

  • Jun 12, 2008
  • The International Journal of Advanced Manufacturing Technology
  • M Gholami +2
  • Research Article
  • Citations76

An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns

  • Oct 28, 2009
  • International Journal of Production Research
  • M Zandieh +1
  • Research Article
  • Citations4

The Off-Table Technique Increases Operating Room Efficiency in Direct Anterior Hip Replacement

  • May 18, 2022
  • Arthroplasty Today
  • Trevor M Owen +3
  • Research Article
  • Citations25

Production lot sizing and scheduling with non-triangular sequence-dependent setup times

  • Feb 20, 2014
  • International Journal of Production Research
  • Alistair Clark +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.