Scheduling Operations and SMED: Complementary Ways to Improve Productivity

  • Jan 1, 2019
  • Fernando Charrua-Santos +4 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

In most real cases the problem of scheduling operations are sequence dependent, that is, the setup time depends on the sequencing of tasks/batches in the machine. Given the current industrial manufacturing trends and requirements such as high variability, customization and reduction of product life cycles, organizations seek to implement new methodologies to adapt and respond with more flexibly to new demands of the global markets. Thus, this work sought to analyse, inspired by a real case of the textile industry, how production scheduling can be understood as a complement to SMED in order to achieve productivity improvement. In the case under analysis we presented the problem of scheduling tasks in uniform parallel machines with sequence-dependent setup times. The main objective of this work was to minimize the total production time. To this goal, optimization heuristics were used, in this case, simulated annealing algorithm, that demonstrated how the use of heuristics can be an advantage to reduce setup times when associated with other methodologies such as SMED.

Similar Papers
  • Research Article
  • Citations1

Effect of Setup Times and Workload Trigger Levels on Order Review and Release Policies Performance in a Stochastic Dynamic Job Shop with Sequence-Dependent Setup Time — A Simulation Approach

  • Jul 21, 2023
  • Journal of Advanced Manufacturing Systems
  • Sushma Rani +2
  • Research Article
  • Citations51

Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach

  • Nov 01, 2007
  • European Journal of Operational Research
  • Vinícius Amaral Armentano +1
  • PDF
  • Research Article
  • Citations5

Simulated Annealing Algorithm to Minimize Makespanin Single Machine Scheduling Problem withUniform Parallel Machines

  • Jan 01, 2011
  • Intelligent Information Management
  • Panneerselvam Senthilkumar +1
  • Research Article
  • Citations17

Dispatching Rule-based Scheduling Algorithms in a Single Machine with Sequence-dependent Setup Times and Energy Requirements

  • Jan 01, 2016
  • Procedia CIRP
  • Yong-Chan Choi
  • PDF
  • Research Article
  • Citations9

Improved firefly algorithm with courtship learning for unrelated parallel machine scheduling problem with sequence-dependent setup times

  • Mar 12, 2022
  • Journal of Cloud Computing
  • Xingwang Huang +5
  • Research Article
  • Citations29

Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs

  • Oct 31, 2013
  • Computers & Operations Research
  • Javad Navaei +3
  • Research Article
  • Citations25

Production lot sizing and scheduling with non-triangular sequence-dependent setup times

  • Feb 20, 2014
  • International Journal of Production Research
  • Alistair Clark +2
  • Research Article
  • Citations72

Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times

  • Aug 29, 2018
  • Applied Mathematical Modelling
  • Mukund Nilakantan Janardhanan +4
  • Dissertation

A scheduling in flexible flow shop problem with unrelated parallel machines and sequence-dependent setup times

  • Jan 01, 2007
  • Jitti Jungwattanakit
  • Research Article

Scheduling problem solving using genetic and greedy algorithms

  • Jan 01, 2017
  • International Journal of Computer Aided Engineering and Technology
  • R Rajkumar +1
  • Research Article
  • Citations10

Multi‐objective flow shop scheduling using hybrid simulated annealing

  • Aug 31, 2010
  • Measuring Business Excellence
  • Ashwani Dhingra +1
  • Conference Article
  • Citations1

A heuristic algorithm for assembly line balancing with stochastic sequence-dependent setup times

  • May 01, 2017
  • Zeynel Abidin Cil +4
  • Research Article
  • Citations35

Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers

  • Oct 15, 2020
  • Computers & Operations Research
  • Hyun-Jung Kim +1
  • Research Article
  • Citations5

Single-Machine Order Acceptance and Scheduling Problem Considering Setup Time and Release Date Relations

  • Jul 16, 2020
  • Arabian Journal for Science and Engineering
  • Papatya S Bıçakcı +2
  • Research Article
  • Citations110

Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns

  • Jun 12, 2008
  • The International Journal of Advanced Manufacturing Technology
  • M Gholami +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.