• Home
  • Search
  • Critical path tracing in sequential circuits
  • Cite Icon26
  • https://doi.org/10.1109/iccad.1988.122485Copy DOI Icon

Critical path tracing in sequential circuits

  • Nov 7, 1988
  • P.r Menon +2 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Critical path tracing has been shown to be faster than traditional fault simulation methods, but it produces pessimistic results in some cases involving reconvergent fanout. It is shown that the pessimistic nature of critical path tracing in combinational circuits can lead to incorrect results that are not necessarily pessimistic in sequential circuits. A modification of the method for removing the approximation is proposed, and a critical path tracing algorithm for synchronous sequential circuits is presented. >

Similar Papers
  • Conference Article
  • Citations32

Transition fault simulation for sequential circuits

  • Jan 01, 1992
  • Kwang-Ting Cheng
  • Research Article
  • Citations2

SEESIM: a fast synchronous sequential circuit fault simulator with single-event equivalence

  • Jan 01, 1993
  • IEE Proceedings G Circuits, Devices and Systems
  • C.P Wu +2
  • Conference Article
  • Citations7

Sequential test generation with advanced illegal state search

  • Nov 01, 1997
  • M.H Konijnenburg +2
  • Conference Article
  • Citations6

Delay-fault diagnosis based on critical path tracing from symbolic simulation

  • May 10, 1992
  • P Girard +2
  • Conference Article
  • Citations38

ASLAN: Synthesis of approximate sequential circuits

  • Jan 01, 2014
  • Ashish Ranjan +4
  • Book Chapter

High-Speed Logic Level Fault Simulation

  • Jan 01, 2011
  • Raimund Ubar +1
  • Research Article
  • Citations20

Single-fault fault-collapsing analysis in sequential logic circuits

  • Jan 01, 1991
  • IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
  • J.E Chen +2
  • Conference Article
  • Citations1

Autonomous test structures for synchronous sequential circuits

  • May 01, 2012
  • Miloslaw Chodacki +1
  • Conference Article
  • Citations2

A new fault simulator for large synchronous sequential circuits

  • Dec 05, 1994
  • Jer Min Jou +1
  • Conference Article
  • Citations13

Performance optimization of sequential circuits by eliminating retiming bottlenecks

  • Nov 08, 1992
  • Sujit Dey +2
  • Conference Article
  • Citations51

A novel approach to delay-fault diagnosis

  • Jan 02, 2003
  • P Girard +2
  • Conference Article
  • Citations7

On test compaction objectives for combinational and sequential circuits

  • Jan 04, 1998
  • I Pomeranz +1
  • Conference Article
  • Citations10

Logic transformations for synchronous logic synthesis

  • Jan 02, 1990
  • G De Micheli +1
  • Conference Article
  • Citations10

Algorithms for synchronous logic synthesis

  • May 08, 1989
  • G De Micheli +1
  • Research Article
  • Citations2

Rapid Triggering Capability Using an Adaptive Overlay during FPGA Debug

  • Nov 30, 2018
  • ACM Transactions on Design Automation of Electronic Systems
  • Fatemeh Eslami +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.