• Home
  • Search
  • Delay-fault diagnosis based on critical path tracing from symbolic simulation
  • Cite Icon6
  • https://doi.org/10.1109/iscas.1992.230327Copy DOI Icon

Delay-fault diagnosis based on critical path tracing from symbolic simulation

  • May 10, 1992
  • P Girard +2 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

A reliable method for delay fault diagnosis, based on critical path tracing from symbolic simulation of the fault-free circuit, is presented. It does not require timing evaluations and may be very accurate. The diagnosis method consists of simulation of the fault-free circuit with a six-valued logic algebra and a tracing of critical paths from primary outputs to primary inputs. The proposed method is an alternative to fault simulation. It requires no delay size based fault models and considers only the fault-free circuit. Consequently, this approach is faster, reliable, and requires less memory than conventional fault simulation. To improve the diagnosis accuracy, the concept of sensitive lines has been developed. Based on the method presented, a fast algorithm has been implemented in C++ on a SUN-SPARC workstation.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Similar Papers
  • Conference Article
  • Citations8

A New Reliable Method for Delay-Fault Diagnosis

  • Jan 04, 1992
  • M.L Flottes +3
  • Conference Article
  • Citations51

A novel approach to delay-fault diagnosis

  • Jan 02, 2003
  • P Girard +2
  • Conference Article
  • Citations19

Timing-reasoning-based delay fault diagnosis

  • Jan 01, 2006
  • Kai Yang +1
  • Research Article
  • Citations4

An efficient small‐delay faults simulator based on critical path tracing

  • Apr 16, 2014
  • International Journal of Circuit Theory and Applications
  • Tieqiao Liu +3
  • Conference Article
  • Citations26

Critical path tracing in sequential circuits

  • Nov 07, 1988
  • P.R Menon +2
  • Research Article
  • Citations2

SEESIM: a fast synchronous sequential circuit fault simulator with single-event equivalence

  • Jan 01, 1993
  • IEE Proceedings G Circuits, Devices and Systems
  • C.P Wu +2
  • Research Article
  • Citations4

Development and experimental validation of fault detection and diagnosis method in SPWM modulated symmetric cascaded H-bridge multilevel inverter

  • Jan 01, 2020
  • International Journal of Power Electronics
  • Nithin Raj +3
  • Conference Article
  • Citations11

Diagnostic of path and gate delay faults in non-scan sequential circuits

  • Apr 30, 1995
  • P Girard +3
  • Conference Article
  • Citations12

Diagnosing resistive bridges using adaptive techniques

  • Jan 01, 2000
  • J Ghosh-Dastidar +1
  • Conference Article

A Mixed Approach for Unified Logic Diagnosis

  • Jan 01, 2007
  • A Rousset +5
  • Research Article
  • Citations35

Analog fault diagnosis using S-transform preprocessor and a QNN classifier

  • Mar 14, 2013
  • Measurement
  • Yanghong Tan +2
  • Conference Article
  • Citations3

Diagnosis of single gate delay faults in combinational circuits using delay fault simulation

  • Dec 02, 1998
  • H Takahashi +2
  • Research Article

Fault simulation and test generation in combinational circuits using atomic digraphs

  • Oct 01, 1985
  • International Journal of Electronics
  • E Villar +1
  • Conference Article
  • Citations10

Algorithms for fast, memory efficient switch-level fault simulation

  • Jan 01, 1991
  • E Vandris +1
  • Research Article

A Refined Classification Method for Transformer Fault Diagnosis

  • Aug 01, 2019
  • Journal of Physics: Conference Series
  • Le Luan +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.