Abstract

Scheduling a multi-cluster tool with wafer residency time constraints is highly challenging yet important in ensuring high productivity of wafer fabrication. This paper presents a method to find an optimal one-wafer cyclic schedule for it. A Petri net is developed to model its dynamic behavior. By using this model, its schedule is found and analytically expressed as a function of robots' waiting time. In addition, this work establishes the necessary and sufficient conditions under which a feasible one-wafer cyclic schedule exists. Then, it gives efficient algorithms to find such a schedule that is optimal. These algorithms require one to determine the robots' waiting time via simple calculation and thus are efficient.

Similar Papers
  • PDF
  • Research Article
  • Citations99

Polynomial approach to optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools via Petri nets

  • Jan 01, 2018
  • IEEE/CAA Journal of Automatica Sinica
  • Fajun Yang +3
  • Research Article
  • Citations38

Modeling and Optimal Cyclic Scheduling of Time-Constrained Single-Robot-Arm Cluster Tools via Petri Nets and Linear Programming

  • Mar 01, 2020
  • IEEE Transactions on Systems, Man, and Cybernetics: Systems
  • Fajun Yang +5
  • Research Article
  • Citations36

Optimal One-Wafer Cyclic Scheduling of Single-Arm Multicluster Tools With Two-Space Buffering Modules

  • Dec 01, 2014
  • IEEE Transactions on Systems, Man, and Cybernetics: Systems
  • Fajun Yang +3
  • Research Article
  • Citations51

Response Policies to Process Module Failure in Single-Arm Cluster Tools Subject to Wafer Residency Time Constraints

  • Jul 01, 2015
  • IEEE Transactions on Automation Science and Engineering
  • Yan Qiao +3
  • Research Article
  • Citations7

Wafer sojourn time fluctuation analysis for time-constrained dual-arm multi-cluster tools with activity time variation

  • Feb 11, 2020
  • International Journal of Computer Integrated Manufacturing
  • Fajun Yang +4
  • Research Article
  • Citations18

Efficient Approach to Failure Response of Process Module in Dual-Arm Cluster Tools With Wafer Residency Time Constraints

  • Mar 01, 2021
  • IEEE Transactions on Systems, Man, and Cybernetics: Systems
  • Yan Qiao +5
  • Research Article
  • Citations7

Scheduling of time-constrained single-arm cluster tools with purge operations in wafer fabrications

  • Nov 20, 2022
  • Journal of Systems Architecture
  • Fenglian Yuan +3
  • Research Article

Scheduling twin-cluster tools for complete concurrent processing with wafer residence time constraints

  • Jul 01, 2024
  • Journal of Physics: Conference Series
  • Hao Zhou +1
  • Research Article
  • Citations94

Bayesian Belief Network-based approach for diagnostics and prognostics of semiconductor manufacturing systems

  • Jul 15, 2011
  • Robotics and Computer-Integrated Manufacturing
  • Lei Yang +1
  • Research Article
  • Citations9

Petri Net-Based Efficient Determination of Optimal Schedules for Transport-Dominant Single-Arm Multi-Cluster Tools

  • Jan 01, 2018
  • IEEE Access
  • Fajun Yang +5
  • Research Article

Green scheduling of dual-armed cluster tool based on cleaning scenarios

  • Apr 15, 2022
  • Cleaner Logistics and Supply Chain
  • Qing Nie +1
  • Research Article
  • Citations17

An Efficient Deadlock Prevention Policy for Noncyclic Scheduling of Multicluster Tools

  • Oct 01, 2018
  • IEEE Transactions on Automation Science and Engineering
  • Tatsushi Nishi +2
  • Conference Article
  • Citations14

Optimal scheduling of k-unit production of cluster tools with single-blade robots

  • Aug 01, 2008
  • Wai-Kin Chan +3
  • Research Article
  • Citations31

Two-stage heuristic procedure for scheduling job shops

  • Jan 01, 1993
  • Journal of Manufacturing Systems
  • R Vancheeswaran +1
  • Research Article
  • Citations9

Capacity planning for cluster tools in the semiconductor industry

  • Jan 07, 2017
  • International Journal of Production Economics
  • Martin Romauch +1