Abstract

A re-entrant shop describes a manufacturing environment in which a machine can process a job more than once. A re-entrant shop can be classified into a re-entrant job-shop (RJS) and a re-entrant flow-shop (RFS). This article presents the development of the mixed binary integer programming (BIP) technique for the RJS and the RFS scheduling problems. Eight mixed BIP models are proposed for solving re-entrant shop scheduling problems to minimize makespan. The models RJS-1, RJS-2, RJS-3, and RJS-4 are for the RJS problems, while the other four models (RFS-1, RFS-2, RFS-3, and RFS-4) are for the RFS problems. Computational results show that the RJS-4 model is the best of the RJS models, and the RFS-3 model is the best of the RFS models.

Similar Papers
  • Research Article
  • Citations1

Study on Re-entrant Flowshop Scheduling Problem(1st report)

  • Jan 01, 2008
  • Journal of the Japan Society for Precision Engineering
  • Rei Hino +4
  • Research Article
  • Citations47

Optimizing blocking flow shop scheduling problem with total completion time criterion

  • Feb 13, 2013
  • Computers & Operations Research
  • Ghasem Moslehi +1
  • Research Article
  • Citations7

Bi-objective unrelated parallel machine joint scheduling of jobs and preventive maintenance with a dynamic speed-scaling technique

  • Aug 18, 2022
  • Materials Today: Proceedings
  • Sadiqi Assia +4
  • Research Article
  • Citations180

A genetic algorithm for the simultaneous delivery and pickup problems with time window

  • Aug 30, 2011
  • Computers & Industrial Engineering
  • Hsiao-Fan Wang +1
  • Research Article
  • Citations22

A job-shop scheduling approach for optimising sugarcane rail operations

  • Apr 16, 2011
  • Flexible Services and Manufacturing Journal
  • Mahmoud Masoud +2
  • Research Article
  • Citations24

A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization

  • Jan 09, 2009
  • The International Journal of Advanced Manufacturing Technology
  • Seyda Topaloglu +1
  • Research Article
  • Citations4

Hybrid Multi-Objective Methods to Solve Reentrant Shops

  • Oct 01, 2012
  • International Journal of Applied Logistics
  • Frédéric Dugardin +2
  • Conference Article
  • Citations9

A re-entrant flowshop heuristic for online scheduling of the paper path in a large scale printer

  • Mar 09, 2015
  • Umar Waqas +7
  • Conference Article

A new approach to optimal energy management with discrete control

  • Jul 01, 2012
  • P Balaguer +3
  • Book Chapter
  • Citations148

Energy/Environmental Modeling with the MARKAL Family of Models

  • Jan 01, 2002
  • Ad J Seebregts +2
  • Research Article

MODELING, OPTIMISATION AND ANALYSIS OF RE-ENTRANT FLOWSHOP JOB SCHEDULING WITH FUZZY PROCESSING TIMES

  • Jun 30, 2017
  • Nigerian Journal of Technology
  • L Ogunwolu +2
  • Research Article
  • Citations34

Some complexity results in cyclic scheduling

  • Jul 01, 1994
  • Mathematical and Computer Modelling
  • S.T Mccormick +1
  • Conference Article
  • Citations1

PACTS: Power-Aware Charging Time Scheduling in Wireless Rechargeable UAV Networks

  • Oct 29, 2021
  • Mengqi Li +4
  • Book Chapter

Optimization Model for IT Change Management

  • Jan 01, 2015
  • Yixin Diao +2
  • Book Chapter
  • Citations11

On the Integrality Gap of Binary Integer Programs with Gaussian Data

  • Jan 01, 2021
  • Sander Borst +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.