• Home
  • Search
  • Study on Re-entrant Flowshop Scheduling Problem(1st report)
  • Cite Icon1
  • https://doi.org/10.2493/jjspe.74.1119Copy DOI Icon

Study on Re-entrant Flowshop Scheduling Problem(1st report)

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

A new theoretical formulation for re-entrant flow shop scheduling problem is derived to plan an optimum production schedule by mixed integer programming. Flow time, which is an index of the evaluation of the planned schedule, is minimized to decrease amount of work-in-process. Cycle time, which is another important index, is determined by the total load time on a bottleneck machine to manufacture the products at the highest productivity. Both objective function and constraint conditions are described in linear expressions and a general optimization tool is adopted to solve the formulated scheduling problems. Another objective function is also introduced in order to shorten the time for the optimization. Computational scheduling results obtained by the optimization are evaluated and discussed in the present paper.

Similar Papers
  • Research Article
  • Citations17

Integer programming models for the re-entrant shop scheduling problems

  • Jul 01, 2006
  • Engineering Optimization
  • Jen-Shiang Chen +1
  • Research Article

MODELING, OPTIMISATION AND ANALYSIS OF RE-ENTRANT FLOWSHOP JOB SCHEDULING WITH FUZZY PROCESSING TIMES

  • Jun 30, 2017
  • Nigerian Journal of Technology
  • L Ogunwolu +2
  • Research Article
  • Citations9

Pareto optimization for the two-agent scheduling problems with linear non-increasing deterioration based on Internet of Things

  • Sep 15, 2016
  • Future Generation Computer Systems
  • Long Wan +4
  • PDF
  • Research Article
  • Citations2

Scheduling with gaps: new models and algorithms

  • Jul 21, 2021
  • Journal of Scheduling
  • Marek Chrobak +3
  • Research Article
  • Citations3

A Pareto-Optimal Solution for a Multi-Objective Scheduling Problem with Periodic Maintenance Requirement

  • Apr 01, 2012
  • International Journal of Operations Research and Information Systems
  • Deniz Mungan +3
  • Research Article
  • Citations26

A scatter search algorithm with a novel solution representation for flexible open shop scheduling: a multi-objective optimization

  • Apr 20, 2021
  • The Journal of Supercomputing
  • J Behnamian +2
  • Research Article
  • Citations1

Identification of the Characteristic Matrices of Vibration Model by Experiment. 1st Report, An Identification Method Using the Components of Characteristic Matrices as the Design Variables.

  • Jan 01, 1999
  • TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C
  • Shemin Zhang +2
  • Conference Article
  • Citations1

Decimal encoding GA used to solve timetabling problem

  • Aug 01, 2011
  • Jun-Hui Liu +1
  • Book Chapter
  • Citations3

A Self-adaptive Hybrid Population-Based Incremental Learning Algorithm for M-Machine Reentrant Permutation Flow-Shop Scheduling

  • Jan 01, 2013
  • Zuo-Cheng Li +4
  • PDF
  • Research Article
  • Citations18

Order Acceptance and Scheduling Problem with Carbon Emission Reduction and Electricity Tariffs on a Single Machine

  • Sep 30, 2019
  • Sustainability
  • Shih-Hsin Chen +3
  • Research Article

Addressing Operating Room Planning and Scheduling Problem by Genetic Engineering Algorithm

  • Jan 01, 2025
  • IEEE Access
  • Majid Sohrabi +3
  • Research Article
  • Citations48

Hybrid method integrating agent-based modeling and heuristic tree search for scheduling of complex batch processes

  • Sep 18, 2013
  • Computers & Chemical Engineering
  • Yunfei Chu +2
  • Research Article
  • Citations8

Bi-objective unrelated parallel machines scheduling problem with worker allocation and sequence dependent setup times considering machine eligibility and precedence constraints

  • Jan 01, 2023
  • Journal of Industrial and Management Optimization
  • Reza Alizadeh Foroutan +2
  • Research Article
  • Citations7

Lagrangian Relaxation Algorithms for Hybrid Flow-Shop Scheduling Problems with Energy Saving

  • Aug 11, 2014
  • Advanced Materials Research
  • Xiao Li Ding +2
  • Conference Article
  • Citations1

Lagrangian relaxation algorithms for hybrid flow-shop with earliness/tardiness scheduling problems

  • Jun 01, 2014
  • Xiaoli Ding +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.