• Home
  • Search
  • Scheduling with gaps: new models and algorithms
  • Cite Icon2
  • https://doi.org/10.1007/s10951-021-00691-wCopy DOI Icon

Scheduling with gaps: new models and algorithms

Show More
  • Abstract
  • Highlights & Summary
  • PDF
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for several papers on minimum-energy scheduling, there is no work in the scheduling literature that uses performance metrics depending on the gap structure of a schedule. One of our objectives is to initiate the study of such scheduling problems. We focus on the model with unit-length jobs. First we examine scheduling problems with deadlines, where we consider two variants of minimum-gap scheduling: maximizing throughput with a budget for the number of gaps and minimizing the number of gaps with a throughput requirement. We then turn to other objective functions. For example, in some scenarios gaps in a schedule may be actually desirable, leading to the problem of maximizing the number of gaps. A related problem involves minimizing the maximum gap size. The second part of the paper examines the model without deadlines, where we focus on the tradeoff between the number of gaps and the total or maximum flow time. For all these problems we provide polynomial time algorithms, with running times ranging from O(nlog n) for some problems to O(n^7) for other. The solutions involve a spectrum of algorithmic techniques, including different dynamic programming formulations, speed-up techniques based on searching Monge arrays, searching X+Y matrices, or implicit binary search. Throughout the paper, we also draw a connection between gap scheduling problems and their continuous analogues, namely hitting set problems for intervals of real numbers. As it turns out, for some problems the continuous variants provide insights leading to efficient algorithms for the corresponding discrete versions, while for other problems completely new techniques are needed to solve the discrete version.

Loading PDF

Similar Papers
  • Conference Article
  • Citations157

Approximating total flow time on parallel machines

  • Jan 01, 1997
  • Stefano Leonardi +1
  • Research Article
  • Citations3

A Pareto-Optimal Solution for a Multi-Objective Scheduling Problem with Periodic Maintenance Requirement

  • Apr 01, 2012
  • International Journal of Operations Research and Information Systems
  • Deniz Mungan +3
  • Research Article
  • Citations6

A MAC layer power management scheme for efficient energy delay tradeoff in a WLAN

  • May 13, 2007
  • Computer Networks
  • Mahasweta Sarkar +1
  • Research Article
  • Citations6

Target-oriented robust satisficing models for the single machine scheduling problems with release time

  • Apr 04, 2024
  • Computers and Operations Research
  • Xun Zhang +1
  • PDF
  • Research Article
  • Citations4

A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time

  • Jun 03, 2021
  • Journal of Industrial Engineering and Management
  • Pratya Poeri Suryadhini +3
  • Research Article
  • Citations9

Pareto optimization for the two-agent scheduling problems with linear non-increasing deterioration based on Internet of Things

  • Sep 15, 2016
  • Future Generation Computer Systems
  • Long Wan +4
  • PDF
  • Research Article
  • Citations18

Order Acceptance and Scheduling Problem with Carbon Emission Reduction and Electricity Tariffs on a Single Machine

  • Sep 30, 2019
  • Sustainability
  • Shih-Hsin Chen +3
  • Research Article
  • Citations553

A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem

  • Mar 01, 2007
  • European Journal of Operational Research
  • M Fatih Tasgetiren +3
  • Research Article
  • Citations51

Hybrid monkey search algorithm for flow shop scheduling problem under makespan and total flow time

  • Feb 07, 2017
  • Applied Soft Computing
  • M.K Marichelvam +2
  • PDF
  • Research Article
  • Citations1

Nature-Inspired Metaheuristics for Two-Agent Scheduling with Due Date and Release Time

  • Dec 29, 2020
  • Complexity
  • Hongwei Li +4
  • Research Article
  • Citations1

Study on Re-entrant Flowshop Scheduling Problem(1st report)

  • Jan 01, 2008
  • Journal of the Japan Society for Precision Engineering
  • Rei Hino +4
  • Research Article
  • Citations11

Minimization of squared deviation of completion times about a common due date

  • Nov 21, 2001
  • Computers and Operations Research
  • Sakib A Mondal
  • Research Article
  • Citations6

Path costs in evolutionary tree reconstruction.

  • Jan 01, 1997
  • Journal of Computational Biology
  • Dorit S Hochbaum +1
  • PDF
  • Research Article
  • Citations2

A single machine multi-job integer batch scheduling problem with multi due date to minimize total actual flow time

  • Jan 01, 2021
  • Decision Science Letters
  • Rinto Yusriski +3
  • PDF
  • Research Article
  • Citations13

Dynamic Restructuring Framework for Scheduling with Release Times and Due-Dates

  • Nov 14, 2019
  • Mathematics
  • Nodari Vakhania
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.