- Conference Article
1
- 10.1109/infoman.2017.7950373
Note on single machine scheduling problems with resource dependent release times
- Apr 01, 2017
- Hui Zhu + 1 more +1
The aim of this note is to study single machine scheduling problems with resource dependent release times. Each job starts as soon as it is released and release cost will be generated if its actual release time deviates from the initial release time. The objective is determining a sequence of jobs in addition to their release times concurrently, in order that weighted release cost, makespan and total completion times of jobs are minimized. Two cases are considered, in which the problem with restricted initial release time is NP-hard and the problem with unrestricted initial release time is polynomially solvable by efficient algorithm with the analysis of optimality properties.
Read more