• Home
  • Search
  • Layout-Aware Critical Path Delay Test Under Maximum Power Supply Noise Effects
  • Cite Icon22
  • https://doi.org/10.1109/tcad.2011.2163159Copy DOI Icon

Layout-Aware Critical Path Delay Test Under Maximum Power Supply Noise Effects

  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

As technology shrinks, gate sensitivity to noise increases due to supply voltage scaling and limited scaling of the voltage threshold. As a result, power supply noise (PSN) plays a greater role in sub-100 nm technologies and creates signal integrity issues. It is vital to consider supply voltage noise effects: 1) during design validation to apply sufficient guardbands to critical paths, and 2) during path delay test to ensure the performance and reliability of the chip. In this paper, a novel layout-aware pattern generation procedure is proposed to maximize PSN effects on critical paths considering the impact of local voltage drop. The proposed pattern generation and validation flow is implemented on the ITC'99 b19 benchmark. Experimental results for both wire-bond and flip-chip packaging styles are presented. Results demonstrate that our proposed method is fast, significantly increases switching around the functionally testable critical paths, and induces large voltage drop on cells placed on the critical paths which results in increased path delay. The proposed method eliminates the very time consuming pattern validation phase that is practised in industry.

Similar Papers
  • Research Article

NIM-X: A Noise Index Model-Based X-Filling Technique to Overcome the Power Supply Switching Noise Effects on Path Delay Test

  • May 01, 2012
  • IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
  • Elif Alpaslan +4
  • Conference Article
  • Citations5

Including Power Supply Variations into Static Timing Analysis: Methodology and Flow

  • Dec 12, 2005
  • M Graziano +2
  • Research Article
  • Citations18

Maple-opt: a performance-oriented simultaneous technology mapping, placement, and global routing algorithm for FPGAs

  • Jan 01, 1998
  • IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
  • N Togawa +2
  • Conference Article
  • Citations3

Maple-opt: a simultaneous technology mapping, placement, and global routing algorithm for FPGAs with performance optimization

  • Aug 06, 2002
  • N Togawa +2
  • Conference Article
  • Citations12

FPGA partitioning for critical paths

  • Feb 28, 1994
  • D Brasen +1
  • Conference Article
  • Citations4

A statistical critical path monitor in 14nm CMOS

  • Oct 01, 2016
  • Bruce Fleischer +3
  • Conference Article
  • Citations3

Applying Machine Learning to Design for Reliability Coverage

  • Mar 01, 2019
  • Norman Chang +13
  • Research Article
  • Citations2

An Efficient False Path-Aware Heuristic Critical Path Selection Method with High Coverage of the Process Variation Space

  • Feb 23, 2018
  • ACM Transactions on Design Automation of Electronic Systems
  • Sheis Abolmaali +3
  • Research Article
  • Citations4

Design Considerations for Reconfigurable Delay Circuit to Emulate System Critical Paths

  • Nov 01, 2015
  • IEEE Transactions on Very Large Scale Integration (VLSI) Systems
  • Xiaobin Yuan +9
  • Book Chapter
  • Citations8

Probabilistic Verification for Reliability of a Two-by-Two Network-on-Chip System

  • Jan 01, 2021
  • Riley Roberts +6
  • Conference Article

The efficient circuit delay evaluation/diagnosis methodology under voltage drop

  • May 01, 2014
  • Ching-Hwa Cheng
  • Conference Article
  • Citations3

Determining schedules for reducing power consumption using multiple supply voltages

  • Sep 23, 2001
  • N Chabini +2
  • Research Article
  • Citations6

Critical Path Selection for Delay Testing Considering Coupling Noise

  • Jul 16, 2009
  • Journal of Electronic Testing
  • Rajeshwary Tayade +1
  • Research Article

An Efficient Decoupling Capacitance Budgeting Methodology by Using Power-Capacitance Ratio

  • Jan 01, 2009
  • IEICE Transactions on Electronics
  • Susumu Kobayashi +1
  • Conference Article
  • Citations2

An impact of process variation on supply voltage dependence of logic path delay variation

  • Apr 01, 2015
  • Shinichi Nishizawa +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.