Team performance and information system implementation

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Although the Earned Value Method (EVM), a multi-dimensional project control system, has been widely used since 1960, there has been little research focused specifically on its application in IS implementation. The management of IS projects--including the accurate forecasting of project duration--is complicated by the strong impact of the learning curve on the effectiveness of EVM. This study makes new contributions by advancing formulas for the accurate prediction of project duration, and by developing a decision support model in which the learning curve is fully integrated with EVM, and performance changes due to learning are isolated from other factors affecting project duration. The study makes three contributions to the understanding and use of EVM in IS implementation: (1) It provides an extended version of EVM, (2) it provides an illustration of the application of EVM to a real project situation based on empirical data from an ERP implementation project, and (3) it provides a theoretical basis for empirical studies of IS project control techniques. The decision support model can be used to determine both the learning curve coefficient and the project completion date during the early stages of a project, and it thus offers a significant practical contribution to the management of IS projects.

Similar Papers
  • PDF
  • Research Article
  • Citations28

Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections

  • Mar 04, 2022
  • Buildings
  • Mayra Proaño-Narváez +3
  • Conference Article
  • Citations4

Research on Target Cost Management of Construction Project with VBQ Based on EVM

  • Jan 01, 2009
  • Bing Xu
  • Research Article
  • Citations12

Using Earned Value Methods to Substantiate Change-of-Scope Claims

  • Mar 01, 2002
  • Engineering Management Journal
  • Paul Kauffmann +2
  • Research Article

Mitigating Scope Variability for PMs in MNC in Research Projects Doing Research for Engineering NPDs Using A Decision Support System and Model

  • Apr 01, 2022
  • International Journal of Advanced Research in Engineering Innovation
  • C M M Chin
  • Research Article
  • Citations1

11.3.1 Systems Engineers' Perceptions on the Adequacy of Project Management Methods for Systems Engineering Management

  • Jul 01, 2010
  • INCOSE International Symposium
  • Amira Sharon +2
  • Research Article
  • Citations41

Software Development Life Cycle (SDLC) Methodologies for Information Systems Project Management

  • Sep 08, 2023
  • International Journal For Multidisciplinary Research
  • Mohammad Ikbal Hossain -
  • Research Article
  • Citations93

Impact of sensitivity information on the prediction of project's duration using earned schedule method

  • Nov 10, 2012
  • International Journal of Project Management
  • Raafat Elshaer
  • Research Article
  • Citations47

Exploiting organizational knowledge in developing IS project cost and schedule estimates: An empirical study

  • Jul 31, 2007
  • Information & Management
  • Raymond M Henry +3
  • Research Article
  • Citations6

Cost and Time Analysis Using Earned Value Method in The Construction of Sports Facilities in Kecamatan Kedewan Kabupaten Bojonegoro

  • Dec 29, 2023
  • Asian Journal of Engineering, Social and Health
  • Sanda Praja Riduwan +2
  • Conference Article
  • Citations1

Project Management Performance Evaluation of Medical Oxygen Generator

  • Feb 16, 2023
  • M Dachyar +1
  • Conference Article
  • Citations2

Benefits Identification in Inter-organizational Information System Implementation Projects: A Multi-case Study Approach

  • Jan 01, 2012
  • Norbert Frick +2
  • Research Article
  • Citations90

Mediators between coordination and IS project performance

  • Aug 21, 2007
  • Information & Management
  • Neeraj Parolia +3
  • Research Article
  • Citations2

IS Project Management and Risk Escalation: Towards A Dynamic Model

  • Mar 11, 2015
  • Australasian Journal of Information Systems
  • Angela Y Lin +1
  • Research Article
  • Citations64

To bridge or to bond? Diverse social connections in an IS project team

  • Oct 17, 2012
  • International Journal of Project Management
  • Jinyoung Han +1
  • Research Article

Project progress measurement under the circumstance of interrupted schedule

  • Jan 01, 2016
  • Filomat
  • Yun-Tao Guo +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.