  • Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections
  • Open Access IconOpen Access
  • Cite Icon28
  • https://doi.org/10.3390/buildings12030301Copy DOI Icon

Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections

  • Mar 4, 2022
  • Buildings
  • Mayra Proaño-Narváez +3 more
Show More
  • Abstract
  • Highlights & Summary
  • PDF
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The earned value method (EVM) is an internationally known technique for project management that emphasizes the control of project cost performance and duration, thus allowing trends to be identified during execution and warning the project manager of variances that may affect the project so that they can take the necessary corrective measures. In this research, the finished projects of a construction company in the city of Cuenca, Ecuador, were assessed. EVM was applied to projects from a database developed with information from each one to rebuild past events, existing problems, and critical points and evaluate the performance over time. The results of this analysis are meant to determine the project’s success, calculating the cost variance at the end. EVM motivates project stakeholders to pay attention to costs and progress so that timely actions can be taken to optimize resources, resulting in the completion of a project within budget and on time. In conclusion, EVM plays an essential role in the integral management of the project in terms of scope, time, and cost. Moreover, there are now guidelines for applying this method as a control tool in future construction projects.

Loading PDF

Similar Papers
  • Conference Article
  • Citations4

Research on Target Cost Management of Construction Project with VBQ Based on EVM

  • Jan 01, 2009
  • Bing Xu
  • Research Article
  • Citations22

Team performance and information system implementation

  • Apr 19, 2008
  • Information Systems Frontiers
  • Malgorzata Plaza
  • Conference Article
  • Citations1

Project Management Performance Evaluation of Medical Oxygen Generator

  • Feb 16, 2023
  • M Dachyar +1
  • Research Article
  • Citations1

Optimalisasi Biaya dan Waktu Proyek Kontruksi Pelebaran Jalan Menggunakan Earned Value

  • Oct 31, 2021
  • Jurnal Manajemen Teknologi & Teknik Sipil
  • Sentot Tri Wibowo +4
  • Research Article

Cost Performance Evaluation of The Improvement of The Wirosari-Karangasem Road Section, Wirosari District Uses Method (Earned Value Concept)

  • Jan 27, 2025
  • International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)
  • Arie Kris Irawan +2
  • Research Article
  • Citations12

Using Earned Value Methods to Substantiate Change-of-Scope Claims

  • Mar 01, 2002
  • Engineering Management Journal
  • Paul Kauffmann +2
  • PDF
  • Research Article

A Guideline of Earned Value Method (EVM) Implementation as Decision Baseline on Acceleration Solutions for Construction Project Scheduling

  • Oct 29, 2023
  • Technium: Romanian Journal of Applied Sciences and Technology
  • Zetta Rasullia Kamandang +2
  • Research Article

Factors That Affect Cost and Time Using Earned Value In Development Projects

  • May 27, 2024
  • Asian Journal of Social and Humanities
  • Titik Nurkaruniati +2
  • Research Article
  • Citations6

Cost and Time Analysis Using Earned Value Method in The Construction of Sports Facilities in Kecamatan Kedewan Kabupaten Bojonegoro

  • Dec 29, 2023
  • Asian Journal of Engineering, Social and Health
  • Sanda Praja Riduwan +2
  • Research Article

Cost and Time Performance Evaluation of a Sports Hall Construction Project Using the Earned Value Method: A Case Study at Gunung Kidul Campus, Universitas Negeri Yogyakarta

  • Jun 10, 2025
  • INERSIA lnformasi dan Ekspose Hasil Riset Teknik Sipil dan Arsitektur
  • Anik Nurul Pratiwi +2
  • PDF
  • Research Article
  • Citations2

Analysis of Control of Costs and Time with Earned Value Method on Road Maintenance Projects in Palmerah District, West Jakarta

  • May 01, 2019
  • Civil Engineering and Architecture
  • Sandy Radhitya Akbar +3
  • Research Article
  • Citations1

11.3.1 Systems Engineers' Perceptions on the Adequacy of Project Management Methods for Systems Engineering Management

  • Jul 01, 2010
  • INCOSE International Symposium
  • Amira Sharon +2
  • PDF
  • Research Article

COST PERFORMANCE ANALYSIS USING EARNED VALUE METHOD ON PRESERVATION OF EXIT TOLL ROAD SECTION 5 PANDAAN MALANG

  • Jan 17, 2024
  • INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY ENGINEERING AND INFORMATION SYSTEM (IJATEIS)
  • Amalia Fathimah Azh Zhahra Mughni +2
  • Research Article

Project Cost Performance Analysis Using the Earned Value Method on the Laga Collector's Highway Improvement Project – Bauguia, Timor-Leste

  • Aug 18, 2024
  • THE SPIRIT OF SOCIETY JOURNAL
  • Laurenco Luis +2
  • Research Article
  • Citations12

Characterizing air pollutant emissions for highway construction projects

  • Nov 16, 2015
  • Smart and Sustainable Built Environment
  • William Rasdorf +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.