Using Earned Value Methods to Substantiate Change-of-Scope Claims

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Earned value is a project management tool that provides significant managerial benefits by identifying project deliverables, tying these outputs to specific group or individual responsibility, and tracking performance over time. A less obvious benefit of earned value is that it can provide the justification for claims related to cost adjustments and scope changes. Most important, if the claim cannot be resolved and legal remedies are pursued, earned value methods are consistent with key legal standards for substantiating cost claims. This article presents a case study of the cost system that was used by a contractor who eventually initiated legal claims against the government for alleged scope changes and related cost increases. It demonstrates the relationship between the legal requirements for cost claims and the capabilities of earned value methods. Finally, it contrasts the deficiencies of the methods used by the contractor with good practice in cost estimation and the earned value method.

Similar Papers
  • Research Article

Cost Performance Evaluation of The Improvement of The Wirosari-Karangasem Road Section, Wirosari District Uses Method (Earned Value Concept)

  • Jan 27, 2025
  • International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)
  • Arie Kris Irawan +2
  • Research Article
  • Citations22

Team performance and information system implementation

  • Apr 19, 2008
  • Information Systems Frontiers
  • Malgorzata Plaza
  • Research Article

Project Cost Performance Analysis Using the Earned Value Method on the Laga Collector's Highway Improvement Project – Bauguia, Timor-Leste

  • Aug 18, 2024
  • THE SPIRIT OF SOCIETY JOURNAL
  • Laurenco Luis +2
  • PDF
  • Research Article
  • Citations28

Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections

  • Mar 04, 2022
  • Buildings
  • Mayra Proaño-Narváez +3
  • Conference Article
  • Citations22

A Management System for Cut and Fill Earthworks Based on 4D CAD and EVMS

  • Jun 24, 2005
  • Nobuyoshi Yabuki +1
  • PDF
  • Research Article

A Guideline of Earned Value Method (EVM) Implementation as Decision Baseline on Acceleration Solutions for Construction Project Scheduling

  • Oct 29, 2023
  • Technium: Romanian Journal of Applied Sciences and Technology
  • Zetta Rasullia Kamandang +2
  • Research Article
  • Citations93

Impact of sensitivity information on the prediction of project's duration using earned schedule method

  • Nov 10, 2012
  • International Journal of Project Management
  • Raafat Elshaer
  • Conference Article

Penerapan Metode Earned Value Analisis (EVA) Pada Proyek Reparasi Kapal

  • Jan 28, 2024
  • Silas Tandi +3
  • Research Article

Evaluasi Kinerja Waktu dan Biaya Proyek Melalui Pengaplikasian Metode Earned Value Studi Kasus Pada Pembangunan Ruas Jalan Sp. Armed Rumah-Great Kec. Biru-Biru Kab. Deli Serdang

  • Dec 31, 2024
  • Majalah Ilmiah METHODA
  • Sederhana Laia +2
  • Research Article

Analisis Earned Value Pada Proyek Pembangunan Gedung Kantor Polsek Kedungwuni Kabupaten Pekalongan Jawa Tengah

  • Oct 31, 2023
  • Jurnal Teknik Sipil dan Teknologi Konstruksi
  • Arie Anggit Wicaksono +1
  • Research Article

Factors That Affect Cost and Time Using Earned Value In Development Projects

  • May 27, 2024
  • Asian Journal of Social and Humanities
  • Titik Nurkaruniati +2
  • Research Article
  • Citations1

11.3.1 Systems Engineers' Perceptions on the Adequacy of Project Management Methods for Systems Engineering Management

  • Jul 01, 2010
  • INCOSE International Symposium
  • Amira Sharon +2
  • PDF
  • Research Article

COST PERFORMANCE ANALYSIS USING EARNED VALUE METHOD ON PRESERVATION OF EXIT TOLL ROAD SECTION 5 PANDAAN MALANG

  • Jan 17, 2024
  • INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY ENGINEERING AND INFORMATION SYSTEM (IJATEIS)
  • Amalia Fathimah Azh Zhahra Mughni +2
  • PDF
  • Research Article
  • Citations3

ANALYSIS OF COST CONTROL, TIME, AND QUALITY ON CONSTRUCTION PROJECT

  • Mar 01, 2018
  • Journal of Management and Business
  • Dewi Nusraningrum +1
  • Research Article
  • Citations1

Optimalisasi Biaya dan Waktu Proyek Kontruksi Pelebaran Jalan Menggunakan Earned Value

  • Oct 31, 2021
  • Jurnal Manajemen Teknologi & Teknik Sipil
  • Sentot Tri Wibowo +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.